I have had Crohn's since I was 16, I am now 23. I graduated college last spring with degree in Structural Engineering. Since last May I have been working for a bridge engineering company as a field engineer. I inspect long span bridges, which involves climbing, rappeling, and being on the bridge all day straight (without a bathroom). This job also requires alot of travel, typically two weeks home and two weeks on the road. All of these factors take a toll on me with my condition.
I really enjoy working for my company and everyone I work with. I have very good benefits working there as well. I would love to work there until I can become a design engineer, which is office work. However there are about 6 people in my section (field engineering) who have been there longer then me and have yet to be offered a design position. Some of them have been there for 9 years, which I am not sure I could wait that long. My company does hire design engineers straight out of college, so it is not a requirement to work in the field first.
My boss is a nice guy, but is somewhat socially awkward I guess you could say. So it is rather hard to have a normal conversation with him, much less to have one with him about Crohn's. I told him a few months ago about my condition and he did not even know what Crohn's is. After I tried to explain it to him he just brushed it off as no big deal (which of course it is). I havent told anyone else at my work that I have Crohn's besides my one friend from college who works there.
So I sort of need some advice. I really dont know how much longer I can go about doing my job as a field engineer. If I go into a flare I doubt I could do my job. Would it be wrong of me to ask if I could start working in design, even with all the people in front of me? Should I talk to Human Resources first before my boss? How would all of you go about doing this?
Thanks for any help/advice!!
I really enjoy working for my company and everyone I work with. I have very good benefits working there as well. I would love to work there until I can become a design engineer, which is office work. However there are about 6 people in my section (field engineering) who have been there longer then me and have yet to be offered a design position. Some of them have been there for 9 years, which I am not sure I could wait that long. My company does hire design engineers straight out of college, so it is not a requirement to work in the field first.
My boss is a nice guy, but is somewhat socially awkward I guess you could say. So it is rather hard to have a normal conversation with him, much less to have one with him about Crohn's. I told him a few months ago about my condition and he did not even know what Crohn's is. After I tried to explain it to him he just brushed it off as no big deal (which of course it is). I havent told anyone else at my work that I have Crohn's besides my one friend from college who works there.
So I sort of need some advice. I really dont know how much longer I can go about doing my job as a field engineer. If I go into a flare I doubt I could do my job. Would it be wrong of me to ask if I could start working in design, even with all the people in front of me? Should I talk to Human Resources first before my boss? How would all of you go about doing this?
Thanks for any help/advice!!